Menu | Basic Construction | Water Supply 1 | Technical Drawing | Computer Applications | Plumbing Science | Plumbing Maintenance | Water Supply2 | Computer Aided Design | Surveying | Blueprint Reading | Drainage System | Welding Practice | Contract Procedure | Estimating | Plumbing Design | Pumping System | Sewage Treatment | Sewerage System

                                    Klik pada tajuk

 

Menu
Objektif
Kakitangan
Pembelajaran
Pengajian Teknikal
Pengajian Am
Kokurikulum
Galari Foto
Maklum Balas

 

  Semester 1

 

Rancangan Pembelajaran

1 2 3 4 5 6 7 8 9 10

Lesson Plan

1 2 3 4 5 6 7 8 9 10

Job Sheet

1 2 3 4 5 6 7 8 9 10

Kertas Penerangan

1 2 3 4 5 6 7 8 9 10

Nota Teori

1 2 3 4 5 6 7 8 9 10

Subjek Teori

1 2 3 4 5 6 7 8 9 10
Equipment , Tool and Machine 1 2 3 4 5 6 7 8 9 10
Maintenance Of Tools And Machine 1 2 3 4 5 6 7 8 9 10
Pipe , Fitting , Bracket , Hooks , Hanger and Their Uses . 1 2 3 4 5 6 7 8 9 10
 Test 1   (15% )  1 jam 1 2 3 4 5 6 7 8 9 10
Types Of Tape , Cocks , Valves and Their Uses   1 2 3 4 5 6 7 8 9 10
Cold Water System 1 2 3 4 5 6 7 8 9 10
Test 2 ( 15% )   1 hour 1 2 3 4 5 6 7 8 9 10
Hot Water Supply 1 2 3 4 5 6 7 8 9 10
Final Exam  ( 40 % ) 1 2 3 4 5 6 7 8 9 10
  Amali 1 2 3 4 5 6 7 8 9 10

Used Appropriate Equipment , Tools and Machine For a Given Job and Comply With Safety Procedures and Regulation

1 2 3 4 5 6 7 8 9 10
Perform Maintenance Of Tools 1 2 3 4 5 6 7 8 9 10
Perform Maintenance Of Machine 1 2 3 4 5 6 7 8 9 10
Used The Variuos Types Of Pipe , Fittings and Brackets For a Given Job 1 2 3 4 5 6 7 8 9 10
Used Various Type Of Tap , Cocks And Valves For A Given Job . 1 2 3 4 5 6 7 8 9 10
Install A Cold Water Supply System To a Given Job / Building and Comply With Code Of Practice And Local ByLaw . 1 2 3 4 5 6 7 8 9 10
perform Testing And Sterilization On The Installation 1 2 3 4 5 6 7 8 9 10
Disemble Project And Clear Surrounding & Works Shop . 1 2 3 4 5 6 7 8 9 10
Install Hot Water Supply System To a Given Job /Building And comply With The Code Of Practice And Local ByLaw . 1 2 3 4 5 6 7 8 9 10
Perform Testing And Sterilization On The Installation .                    
Practical Test  ( 30 %)                    

Menu | Basic Construction | Water Supply 1 | Technical Drawing | Computer Applications | Plumbing Science | Plumbing Maintenance | Water Supply2 | Computer Aided Design | Surveying | Blueprint Reading | Drainage System | Welding Practice | Contract Procedure | Estimating | Plumbing Design | Pumping System | Sewage Treatment | Sewerage System