Menu | Basic Construction | Water Supply 1 | Technical Drawing | Computer Applications | Plumbing Science | Plumbing Maintenance | Water Supply2 | Computer Aided Design | Surveying | Blueprint Reading | Drainage System | Welding Practice | Contract Procedure | Estimating | Plumbing Design | Pumping System | Sewage Treatment | Sewerage System

                                                     Klik pada tajuk untuk pautan
 

Menu
Objektif
Kakitangan
Pembelajaran
Pengajian Teknikal
Pengajian Am
Kokurikulum
Galari Foto
Maklum Balas

            Semester 2

Rancangan Pembelajaran

1 2 3 4 5 6 7 8 9 10

DOUBLE AIR VALVESLUICE VALVE

PILLAR HYDRANT

 

 

Lesson Plan

1 2 3 4 5 6 7 8 9 10

Job Sheet

1 2 3 4 5 6 7 8 9 10

Kertas Penerangan

1 2 3 4 5 6 7 8 9 10

Nota Teori

1 2 3 4 5 6 7 8 9 10

Subjek Teori

NOTA TIORI BERKENAAN

Water Distribution System

1  

Excavation Of Trench For Laying Of Main Pipe

1  

Pipe And Appurtenance

1  

Test 1  ( 25% )

1  

Hydrant

1  

Cross Over And 'S' Bend

1  

Test 2  ( 25% )

1  

Tapping Main Pipe

1  

FINAL EXAM   ( 40 % )

1  

Subjek Amali 

PROJEK AMALI

Set Alignment For Water Main Laying

PELAN ARAHAN SKIMA

Dig And Backfill 

PELAN ARAHAN SKIMA

Lay And Joint Main Pipe

PELAN ARAHAN SKIMA

Fix Valves And Specials

PELAN ARAHAN SKIMA

Construct Temporary Platform For Overhead Pipe

PELAN ARAHAN SKIMA

Conduct Pressure Leakage Test 

PELAN ARAHAN SKIMA

Tap Main Pipe And Install Communication Pipe

PELAN ARAHAN SKIMA

Menu | Basic Construction | Water Supply 1 | Technical Drawing | Computer Applications | Plumbing Science | Plumbing Maintenance | Water Supply2 | Computer Aided Design | Surveying | Blueprint Reading | Drainage System | Welding Practice | Contract Procedure | Estimating | Plumbing Design | Pumping System | Sewage Treatment | Sewerage System